Accounting › Section R · Job order and process costing › Topic R.3
Predetermined overhead rates
Materials and labour can be traced to each job, but the factory's power bill and the supervisor's salary cannot. A predetermined overhead rate, set before the year begins, lets every job carry a fair share of overhead as it is made.
Why overhead needs a rate
A job cost sheet needs three numbers, and the third is awkward. Overhead, meaning indirect materials, indirect labour and other factory costs, cannot be traced to individual jobs, yet each job must carry its share or prices and inventory values will be too low. Waiting for the actual figures does not work either. Many overhead bills arrive weeks after the month ends, and some costs, such as an annual insurance premium or a large repair, are lumpy. Managers quoting a price for a kitchen in March cannot wait until next January to learn what overhead turned out to be. The answer is to estimate overhead in advance and charge it to jobs at a set rate.
Why not use each month's actual rate?
Suppose factory rent is $9,000 a month and a plant makes 300 units in a quiet month and 900 in a busy one. Rent per unit would be $30 in the first month and $10 in the second, though the units are identical. Heating costs more in winter, so a job made in January would look dearer than the same job made in July. Monthly actual rates make costs swing with the calendar and with volume, not with the work a job needs. A single rate for the whole year smooths these swings: each job is charged the same overhead for the same amount of activity, whenever in the year it is made.
The formula
The predetermined overhead rate is set before the year begins and normally kept unchanged all year:
Both the numerator and the denominator are estimates for the coming year. The allocation base, also called the activity base, is the measure used to share overhead among jobs, such as direct labour hours, direct labour cost or machine hours. A rate based on hours is stated in dollars per hour; a rate based on labour cost is stated as a percentage of labour cost. The same base must then be measured for every job, so that each job's share can be calculated.
Estimating the overhead
The overhead estimate comes from the factory budget, often starting from past years' costs adjusted for expected prices and volume. Brackenridge Cabinetry's estimate for 2026 is $360,000: indirect materials $18,000, indirect labour $120,000, power and heat $54,000, depreciation of factory equipment $96,000, factory rent $16,800, and factory insurance and property tax $55,200. Office and selling costs are left out, because they are period costs. Estimating is hard: energy prices, wage settlements and repair bills can all move between the budget and the work. That is why actual overhead almost never matches the overhead charged to jobs, a gap dealt with in "Costing a job and fixing misapplied overhead".
Choosing the allocation base
A good base is a cost driver: an activity whose level causes overhead to rise and fall. In a labour-intensive shop such as Brackenridge, more labour hours mean more supervision, more power for hand tools and more wear on benches, so direct labour hours are a sensible base. In an automated plant, overhead is mostly depreciation, power and maintenance of machines, so machine hours fit better. Direct labour cost works like labour hours, but it charges more overhead to jobs done by better-paid workers even when they use no more of the factory. Traditionally labour was the usual base, but as automation has reduced direct labour, machine hours have become more common.
Worked example: one budget, three rates
Brackenridge estimates $360,000 of overhead, 12,000 direct labour hours, $300,000 of direct labour cost (12,000 hours at $25) and 9,000 machine hours. 1. Per labour hour: \(360{,}000 \div 12{,}000 = 30\), or $30. 2. Per machine hour: \(360{,}000 \div 9{,}000 = 40\), or $40. 3. As a percentage of labour cost: \(360{,}000 \div 300{,}000 = 1.20\), or 120%. 4. Job 302 used 120 labour hours ($3,000 of labour) and 70 machine hours. On labour hours it is charged \(120 \times 30 = 3{,}600\). On labour cost, \(1.20 \times 3{,}000 = 3{,}600\), the same, because every worker earns $25. On machine hours, \(70 \times 40 = 2{,}800\). 5. Brackenridge chooses labour hours, the driver of its overhead.
Applying overhead to jobs
Applied overhead is the rate times the actual amount of the base each job uses:
It is charged as the work happens, and at the latest when a job is finished or the period ends. Jobs therefore carry actual materials, actual labour and applied overhead, a method called normal costing. In the ledger, actual overhead costs are debited to Manufacturing Overhead (Mfg. Overhead) as incurred, and applied overhead is credited to it and debited to Work in Process Inventory (WIP Inventory). Brackenridge's March jobs used 210 labour hours:
Worked example: a machine-heavy plant
Tarnbrook Precision machines metal parts on automated lathes. 1. It budgets $918,000 of overhead for 2026 and 27,000 machine hours, so its rate is \(918{,}000 \div 27{,}000 = 34\), or $34 per machine hour. 2. Job T-17 uses 46 machine hours and 12 direct labour hours, so it is charged \(46 \times 34 = 1{,}564\), or $1,564. 3. Had Tarnbrook used labour hours, with 18,000 budgeted, the rate would be \(918{,}000 \div 18{,}000 = 51\) and Job T-17 would carry only \(12 \times 51 = 612\). 4. Most of Tarnbrook's overhead is machine-related, and this job keeps machines busy, so the $1,564 is the more believable figure. A poor base undercosts some jobs and overcosts others, which can lead to bad pricing.
One rate or several
The examples so far use a plantwide rate, one rate for the whole factory. A firm whose departments differ sharply can instead set a departmental rate for each: machine hours in an automated machining department, labour hours in a hand-finishing department. Each job is then charged in every department it passes through. Going further, activity-based costing uses separate rates for activities such as machine setups and inspections. These approaches are compared in "Traditional overhead allocation and cost drivers" and "Activity-based product costs". More rates usually give more accurate job costs, but cost more to run, so the extra effort pays only where jobs use departments or activities very differently.
Common mistakes to avoid
First, dividing by the actual base instead of the estimated base when setting the rate; the rate is fixed before the year from estimates. Second, applying overhead with the estimated hours of a job instead of the hours it actually used. Third, including selling or administrative costs in estimated overhead. Fourth, choosing a base with no cause-and-effect link to overhead, such as labour hours in a nearly unmanned plant. Fifth, recalculating the rate each month, which brings back the volume and seasonal swings the rate was meant to remove. Sixth, forgetting to apply overhead to jobs still in process at the end of a period.
Key takeaways
Overhead cannot be traced to jobs, so it is applied with a predetermined rate: estimated total overhead divided by the estimated total allocation base, set before the year. The base should be a cost driver, such as direct labour hours in labour-intensive work or machine hours in automated work. Applied overhead equals the rate times the base each job actually uses. Actual overhead is debited to Mfg. Overhead and applied overhead is credited to it. Brackenridge's rate is $30 per labour hour; Tarnbrook's is $34 per machine hour. Departmental or activity rates can sharpen job costs where operations differ.
Flashcards
Flashcard
Estimated total overhead ÷ estimated total allocation base
Test your understanding
Question 1 of 5
Before the year, a plant estimates overhead of $480,000 and 32,000 machine hours. By year end it has actually used 30,000 machine hours. What is its predetermined overhead rate?
Question 2 of 5
The rate is $22 per direct labour hour. A job was estimated at 50 hours but actually used 46. How much overhead is applied to it?
Question 3 of 5
Why do firms use a predetermined rate rather than each month's actual overhead rate?
Question 4 of 5
Which allocation base best fits a highly automated bottling plant?
Question 5 of 5
Which entry records overhead applied to jobs?
