Intro to Business › Section J · Operations management › Topic J.1

Production and operations management

Every organisation, from a car plant to a hospital to a streaming service, turns resources into something customers want. Operations management is the discipline of running that conversion well: at the right quality, at the right cost and at the right time.

Turning inputs into outputs

Production is the creation of goods and services. It takes inputs, such as natural resources, raw materials, labour, equipment, capital and information, and converts them into outputs that customers value. Operations management is the planning and control of that conversion process. A furniture maker converts timber, glue, machines and skilled labour into chairs. A hospital converts the knowledge of its staff, equipment and medicines into treatment. A university converts teaching, buildings and library resources into educated graduates. The word production often suggests factories, which is why many writers prefer the broader term operations: the same questions of process, capacity, quality and scheduling arise in every kind of organisation.

Goods and services

Services differ from goods in four ways that shape how they are run. They are intangible: a haircut or a legal opinion cannot be inspected before it is bought. They are usually produced and consumed at the same time, often with the customer present and taking part. They are variable, because quality depends on who delivers them and when. And they are perishable: an empty hotel room or an unsold airline seat tonight cannot be stored and sold tomorrow. Service operations therefore focus on matching staff to demand, managing queues and designing the customer's experience. Most real offerings mix the two; a restaurant meal is both a good and a service.

What operations managers do

Operations managers run the conversion process, and they usually control a large share of a firm's assets and costs: inventories, equipment, and the wages of most of the workforce. They work closely with every other function. Marketing tells them what customers want and how much will sell. Finance decides how much can be spent on equipment and stock. Accounting tracks costs per unit. Human resources helps recruit and train the people who do the work. Operations managers also take part in designing new products, because a design that is hard to make will be costly however good it looks. Their decisions fall into three overlapping stages: planning, control and improvement.

Planning, control and improvement

Production planning decides what will be made, how, where and when, and secures the resources needed. Its long-term phase, roughly three to five years ahead, covers which products to make, in what volumes and in which facilities. Medium-term planning, around two years ahead, covers facility layout, sources of resources and labour. Short-term planning, within one year, turns these into detailed production schedules and material plans. Production control then manages day-to-day operations: scheduling, quality, costs and fixing problems as they arise. Improvement looks for better methods, through quality programmes, lean techniques and technology. The three stages run at the same time, and each later topic in this section takes one of them in turn.

Measuring productivity

Productivity is output per unit of input:

\text{Productivity} = \frac{\text{Output}}{\text{Input}}

Labour productivity divides output by labour hours, such as meals served per staff hour. Multifactor productivity divides the value of output by the combined cost of several inputs, such as labour, materials and energy, so it shows whether savings on one input were simply shifted to another. Productivity rises when output grows faster than inputs, or inputs fall faster than output. Rising productivity is the main way a firm can pay higher wages without raising prices, and across a whole economy it is the main source of rising living standards over time.

Worked example: a print shop's productivity

A print shop with 6 staff each working 40 hours produces 4,800 jobs in a week. 1. Labour hours: \(6 \times 40 = 240\). 2. Labour productivity: \(4{,}800 \div 240 = 20\) jobs per labour hour. 3. After the shop reorganises its workflow so that staff stop walking between floors, the same 240 hours produce 5,400 jobs: \(5{,}400 \div 240 = 22.5\) jobs per hour. 4. Improvement: \(22.5 \div 20 - 1 = 0.125\), or 12.5%. 5. Multifactor view: if a week's output is worth 60,000 dollars and labour, paper and ink, and overheads cost 18,000, 21,000 and 9,000 dollars, then multifactor productivity is \(60{,}000 \div 48{,}000 = 1.25\) dollars of output per dollar of input.

Capacity and utilisation

Capacity is the maximum output a facility can produce in a period. Design capacity is the theoretical maximum under ideal conditions. Effective capacity is lower: the most that can realistically be achieved after planned maintenance, changeovers, breaks and the product mix are allowed for. Two ratios follow:

\text{Utilisation} = \frac{\text{Actual output}}{\text{Design capacity}}
\text{Efficiency} = \frac{\text{Actual output}}{\text{Effective capacity}}

Low utilisation means expensive equipment and staff sit idle. Very high utilisation is not ideal either: with no slack, queues build up, maintenance gets skipped and any disruption causes delays. Many service operations deliberately plan to run below full capacity for that reason.

Worked example: a kitchen's capacity

A central kitchen that supplies school lunches has a design capacity of 2,000 meals a week. After allowing for cleaning, deliveries and menu changeovers, its effective capacity is 1,800 meals. Last week it produced 1,530. 1. Utilisation: \(1{,}530 \div 2{,}000 = 0.765\), or 76.5%. 2. Efficiency: \(1{,}530 \div 1{,}800 = 0.85\), or 85%. 3. Interpretation: the kitchen used just over three-quarters of its theoretical maximum, but 85% of what is realistically achievable, so the gap is mostly planned downtime, not poor performance. 4. Check: efficiency is always at least as high as utilisation, because effective capacity cannot exceed design capacity.

Why operations became strategic

For much of the twentieth century, manufacturing in many firms was inward-looking: it made what engineers designed and left customers to marketing. Henry Ford's moving assembly line at Highland Park, Michigan, introduced in 1913, showed how much operations could matter, cutting the time to assemble a Model T chassis from about twelve and a half hours to about an hour and a half and putting cars within reach of millions. In the 1970s and 1980s, many American carmakers and electronics firms lost market share to Japanese competitors whose operations delivered better quality at lower cost. Since then, firms have treated operations as a source of competitive advantage in its own right, with customer satisfaction as its goal.

Common mistakes to avoid

First, thinking operations management applies only to factories; services face the same questions. Second, measuring productivity with only one input and missing costs shifted to another, which multifactor productivity reveals. Third, confusing utilisation, measured against design capacity, with efficiency, measured against effective capacity. Fourth, assuming 100% utilisation is the goal; with no slack, small disruptions cause long delays. Fifth, forgetting that services are perishable: unused capacity today cannot be stored. Sixth, treating the three stages of operations management as one-off steps rather than continuous, overlapping work.

Key takeaways

Operations management plans and controls the conversion of inputs into goods and services. Services are intangible, produced and consumed together, variable and perishable. Operations managers control much of a firm's assets and work with every function across three stages: planning (long, medium and short term), control and improvement. Productivity = output ÷ input, in single-factor or multifactor form. Utilisation compares actual output with design capacity, and efficiency with effective capacity. Since the 1980s, operations has been treated as a competitive weapon.

Flashcards

Flashcard

Production

The creation of goods and services from inputs

Inputs → conversion → outputs.

Test your understanding

Question 1 of 5

A clinic has a design capacity of 6,000 appointments a month and an effective capacity of 5,600. It delivered 4,200 appointments. What are its utilisation and efficiency?

Question 2 of 5

A bakery's 5 bakers each work 8 hours and produce 1,000 loaves. After a layout change, the same hours produce 1,100 loaves. What happened to labour productivity?

Question 3 of 5

A hotel has 20 empty rooms tonight. Which characteristic of services does this illustrate most directly?

Question 4 of 5

Why might a call centre deliberately plan to run below 100% utilisation?

Question 5 of 5

Which decision belongs to long-term production planning?