Intro to Business › Section J · Operations management › Topic J.2
The production process
A bakery that makes one wedding cake at a time and a plant that bakes a million identical loaves a week face the same basic question: how should the work flow? The answer depends on volume and variety, and it decides costs, flexibility and how much the operation can produce.
Choosing a production process
A production process is the method by which a firm makes its product or delivers its service. The first decision in production planning is which kind of process fits the firm's goals and its customers' demands. Two features of the product drive the choice: volume, how many units are needed, and variety, how much each unit differs from the next. High volume and low variety favour standardised, repetitive processes with low cost per unit. Low volume and high variety favour flexible processes with skilled people and general-purpose equipment, at a higher cost per unit. Operations managers also classify processes by how inputs are converted and by their timing, which later cards explain.
Mass production, mass customisation, customisation
Mass production makes large numbers of identical goods with standardised, repetitive methods, keeping cost per unit low: soft drinks, light bulbs, breakfast cereal. It grew out of the Industrial Revolution and was transformed by Ford's moving assembly line from 1913. Mass customisation uses mass-production methods up to a point and then tailors the product to each customer, such as a laptop built to a chosen specification or trainers with a customer's choice of colours. Customisation is the opposite of mass production: each product or service is made to one customer's requirements, such as a bespoke suit, a custom home, a haircut or legal advice. A factory that makes goods to individual customer orders is called a job shop.
Job, batch and flow
Another common classification describes how work moves. Job production makes one-off items, each different, such as a bridge, a ship or a wedding dress. Batch production makes a set quantity of one item, then switches equipment to make a batch of something else, as a bakery does with bread, then rolls, then cakes. Flow production moves units continuously through a fixed sequence of stations, as on a car assembly line or a bottling plant. Moving from job to flow, cost per unit falls and volume rises, but flexibility falls. Robert Hayes and Steven Wheelwright (1979) showed this as a product-process matrix: firms do best when their process sits on the diagonal that matches their product's volume and variety.
Converting inputs: process and assembly
Processes also differ in how they convert inputs. In process manufacturing, a single raw input is split or refined into several products: crude oil is refined into petrol, diesel and other products, and wood pulp becomes paper. In assembly, inputs are combined into a finished product: thousands of parts become a smartphone. Some processes transform an input instead, as when heat turns iron ore into iron, or treated milk becomes cheese. Services convert inputs too, though less visibly. An accountant combines expertise, software and the client's records into a tax return. In many services the customer is an input, because the work cannot be done without their information or presence.
Continuous and intermittent processes
Timing gives a final classification. A continuous process runs for long periods, days, weeks or even months, without shutting equipment down to change products. It suits high-volume, low-variety output, such as paper towels, chemicals or electricity, and keeps cost per unit low and scheduling simple. Utilities that supply water, gas and electricity are continuous services. An intermittent process uses short runs to make batches of different products, stopping to reset machines between them. It suits low-volume, high-variety output, including mass customisation and customisation. Most services are intermittent: a hair salon, a surgeon or a garage handles one different job after another.
Capacity and the bottleneck
In a flow process, units pass through every station in order, so the line can go no faster than its slowest station, the bottleneck. If each unit spends 2 minutes at one station and 3 minutes at the next, the line produces one unit every 3 minutes, however fast the other stations are. So
To meet demand, managers compare each station's time with the required cycle time:
Any station slower than the cycle time must be sped up, split between workers or given extra equipment.
Worked example: finding the bottleneck
A bicycle-wheel line has four stations taking 2.0, 3.0, 2.5 and 1.5 minutes per wheel. A shift has 480 working minutes, and customers want 200 wheels per shift. 1. Bottleneck: station 2, at 3.0 minutes. 2. Capacity: \(480 \div 3.0 = 160\) wheels per shift, short of demand. 3. Required cycle time: \(480 \div 200 = 2.4\) minutes, so stations 2 and 3 are too slow. 4. Add a second machine at station 2, halving its effective time to 1.5 minutes. 5. New bottleneck: station 3, at 2.5 minutes, so capacity is \(480 \div 2.5 = 192\) wheels. 6. Check: still below 200, so station 3 also needs help. Fixing one bottleneck moves it to the next slowest station.
Worked example: matching process to product
Choose a process for three businesses and justify it. 1. A firm making a single brand of bottled water, millions of identical bottles a year: high volume, no variety, so mass production with a continuous flow line keeps cost per bottle lowest. 2. A furniture maker offering ten sofa frames, each in any of 40 fabrics, delivered within weeks: standard frames at volume, then fabric chosen per order, so mass customisation with an intermittent finishing stage. 3. A studio designing one-off stage sets for theatres: every order unique, low volume, so customisation as a job shop with skilled staff and general-purpose tools. 4. Check: each choice sits on the product-process diagonal; a flow line for stage sets would be idle and rigid.
Common mistakes to avoid
First, confusing mass customisation, standardised up to a point then tailored, with customisation, where every unit is unique from the start. Second, mixing up process manufacturing, which breaks inputs down, with assembly, which combines them. Third, assuming services cannot be continuous; utilities are. Fourth, calculating line capacity from the average station time instead of the slowest station. Fifth, expecting a line to reach full demand after fixing only one bottleneck; the constraint usually moves. Sixth, choosing a process off the product-process diagonal, such as a rigid flow line for highly varied low-volume work.
Key takeaways
Volume and variety drive the choice of production process. Mass production makes identical goods cheaply; mass customisation tailors standard products late in the process; customisation makes each unit to order in a job shop. Job, batch and flow describe how work moves, and the product-process matrix matches them to products. Process manufacturing breaks inputs down; assembly combines them. Continuous processes suit high volume; intermittent processes suit variety. Line capacity = available time ÷ bottleneck time, and cycle time = available time ÷ demand.
Flashcards
Flashcard
The method by which a firm makes a product or delivers a service
Test your understanding
Question 1 of 5
A three-station line takes 4, 5 and 3 minutes per unit, and a shift has 450 working minutes. What is the line's capacity per shift?
Question 2 of 5
Customers want 300 units per 600-minute day. What cycle time must every station meet?
Question 3 of 5
A paint maker produces one base colour in huge volumes and adds tints chosen by each customer at the shop counter. Which type of production is this?
Question 4 of 5
An oil refinery turns crude oil into petrol, diesel and jet fuel. How is this conversion classified?
Question 5 of 5
A firm adds a second machine at its bottleneck station, but output rises less than expected. What is the most likely reason?